As usual the installation time frame was a whirlwind requiring me to be in the gallery at all hours of the night. This was largely due to the scissor lift scheduling. It took me a day and a half to fabricate before I even began hanging. Then, I had another day and a half to hang these guys from the ceiling. I was competing with lighting fixtures, exposed utilities, etc. all while trying to drive the lift from 2 story's up.
No comments:
Post a Comment